1542 TULANE AVE. :

  • The contractor started cleaning the coffee kiosk area on the 1st Floor.
  • Facility Services continued to install the new automatic doors.
  • The contractor replaced cracked window glass in 3rd and 6th Floor offices, and in Stairwell #3.

 

DENTAL SCHOOL AUDITORIUMS A & B RENOVATIONS:

  • The A/V contractor configured connections from the A/V rack to the Access Grid rack.
  • IT configured additional components of the Access Grid system in the A/V Room.
  • The fire alarm contractor tested the fire alarm system for proper operation (yesterday after-hours).

 

EXTERIOR/LANDSCAPING:

  • Facility Services continued installing irrigation piping on the Gravier Street side of the Roman St. Garage. 

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued relocating the temporary A/C units to the 4th and 5th Floor Quadrant D (corner of Bolivar Street and Perdido Street ).
  • The contractor continued testing and balancing air handling units 6-A and 7-A.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor installed the door hardware.    

 

MEB 7th FLOOR PHYSIOLOGY LABS RENOVATIONS:

  • The contractor continued roughing in the electrical for Rooms 7241, 7244, and 7250.   

 

ALLIED HEALTH/NURSING BLDG. RE-ROOFING PROJECT:

  • The contractor flashed in the front of the AHSON entrance. 

 

RESIDENCE HALL 2nd FLOOR LOBBY RENOVATIONS:  

  • The contractor continued installing metal screen on the security desk and the TV enclosure cabinet.
  • The floor contractor installed porcelain bases on the vertical wall across from the A, B, and C Tower elevators.
  • The contractor trimmed out the floor boxes and ran network wires for the security desk.
  • The painters painted the walls perpendicular to the window wall across from Elevators A and B.