  • The contractor painted the door frames that lead into the hallway behind the coffee kiosk and cleaned the kiosk area.
  • Workers replaced cracked window glass in Stairwell #1 and #3.
  • New doors and frames were installed for the parking garage pipe chase.

 

DENTAL SCHOOL AUDITORIUM A & B RENOVATIONS:

  • The A/V contractor continued to configure the connections between the A/V racks and the access grid racks.

 

EXTERIOR/LANDSCAPING:

  • Facility Services continued installing irrigation piping on the Gravier Street side of the Roman St. Garage. 

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued relocating the temporary A/C units to the 4th and 5th Floor Quadrant D (corner of Bolivar Street and Perdido Street ).
  • The contractor continued testing and balancing air handling units 6-A and 7-A.

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor completed installing the electrical door hardware.    
  • They installed a register above the digital sign.  

 

MEB 7th FLOOR PHYSIOLOGY LABS RENOVATIONS:

  • The contractor continued roughing in the electrical for Rooms 7241, 7244, and 7250.   

 

ALLIED HEALTH/NURSING BLDG. REROOFING PROJECT:

  • The contractor finished trimming the roof covering the entrance roof to the building. 

 

RESIDENCE HALL 2nd FLOOR LOBBY RENOVATIONS:  

  • The contractor completed installing a metal screen on the security desk and the TV enclosure cabinet.
  • The flooring contractor grouted the porcelain base on the vertical wall across from the A, B, and C tower elevators.
  • The painting contractor applied a second coat of paint to the walls of the entire 2nd Floor lobby.
  • The contractor swept and mopped the lobby floor.