The contractor demolished walls and ceiling in Rooms 203 and 203A for the 2nd Floor garage/building entrance
EXTERIOR/LANDSCAPING:
Facility Services continued demolition in the T-lot in preparation for landscaping.
The contractor removed stumps in the field between Florida Avenue and the railroad at the City Park Campus.
MEB
AIR HANDLING UNIT REPLACEMENT:
Facility Services continued monitoring the temporary A/C units serving the 4th and 5th Floor Quadrant C (corner of Bolivar Street and MEB loading dock).
The contractor demolished the old AHU 4-C and 5-C.
They installed the new AHU 4-C and 5-C and began connecting new ductwork and new piping.
MEB
7th FLOOR PHYSIOLOGY LABS RENOVATION:
The contractor installed countertops on the new casework in Room 7250.
RESOURCE CENTER 6TH FLOOR ELEVATOR LOBBY:
The contractor reassembled the water fountains on both sides of the lobby.