Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, SEPTEMBER 14, 2009

 

1542 TULANE 1st FLOOR GARAGE ENTRANCE:

  • The contractor demolished walls and ceiling in Rooms 203 and 203A for the 2nd Floor garage/building entrance

   

EXTERIOR/LANDSCAPING:

  • Facility Services continued demolition in the T-lot in preparation for landscaping.
  • The contractor removed stumps in the field between Florida Avenue and the railroad at the City Park Campus.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring the temporary A/C units serving the 4th and 5th Floor Quadrant C (corner of Bolivar Street and MEB loading dock).
  • The contractor demolished the old AHU 4-C and 5-C.
  • They installed the new AHU 4-C and 5-C and began connecting new ductwork and new piping. 

 

MEB 7th FLOOR PHYSIOLOGY LABS RENOVATION:

  • The contractor installed countertops on the new casework in Room 7250.

 

RESOURCE CENTER 6TH FLOOR ELEVATOR LOBBY:

  • The contractor reassembled the water fountains on both sides of the lobby.