1542 TULANE 2nd FLOOR GARAGE ENTRANCE:

  • The contractor demolished the electrical utilities (lights and outlets) in Rooms 203 and 242B for the 2nd level parking garage corridor entrance.

   

EXTERIOR/LANDSCAPING:

  • Facility Services continued demolition in the T-lot in preparation for landscaping.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring the temporary A/C units in the 4th and 5th Floor Quadrant C (corner of Bolivar Street and MEB loading dock).
  • The contractor continued installing new ductwork and piping for AHU 4-C and 5-C. 

 

MEB 7th FLOOR PHYSIOLOGY LABS RENOVATION:

  • The contractor continued installing countertops in Rooms 7221, 7241, and 7250.
  • The contractor ran network wires in Rooms 7241 and 7250.

 

RESOURCE CENTER 6TH FLOOR ELEVATOR LOBBY:

  • The contractor installed cove base in the lobby.