1542 TULANE GARAGE ENTRANCES:

  • The contractor continued skim coating the walls.
  • They cut the opening for the 1st Floor entryway. 

 

EXTERIOR/LANDSCAPING:

  • Facility Services completed installing the irrigation piping and electrical wiring around the T-lot.
  • Workers continued placing topsoil in the planting areas around lot.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring the temporary A/C units in the 4th and 5th Floor Quadrant C (corner of Bolivar Street and MEB loading dock).
  • The contractor continued installing the control wiring for AHU 4-C and 5-C. 

 

MEB 7th FLOOR PHYSIOLOGY LABS RENOVATION:

  • The contractor installed the door and frame in Room 7244.
  • Crews installed fume hoods and connected the exhaust ducts in Rooms 7241 and 7244.
  • They continued installing countertops in Rooms 7244 and 7250

 

MDL 4 RENOVATION:

  • The contractor removed the old plumbing and lab furniture. 

 

MEB MORGUE AUTOPSY HVAC UPGRADE:

  • The contractor continued removing existing exhaust duct on the 1st Floor.