1542 TULANE GARAGE ENTRANCES:

  • The contractor installed sheetrock for the 2nd Floor entrance.

 

EXTERIOR/LANDSCAPING:

  • Facility Services laid out the new sidewalk in the corner of the T-lot.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued setting up temporary A/C units in the 4th and 5th Floor Quadrant B (corner of South Roman Street and Perdido Street ).
  • The contractor began preparations for demolishing AHU 4-B and 5-B. 

 

MEB 7th FLOOR PHYSIOLOGY LABS RENOVATION:

  • The contractor installed shelving in Rooms 7221 and 7244.
  • Crews continued terminating data jacks in Rooms 7241, 7244, and 7250.
  • They trimmed out the electrical raceway in Rooms 7241, 7244, and 7250.

 

MEB 4TH FLOOR MDL #4 RENOVATIONS:

  • The contractor removed plumbing, electrical, existing lab furniture, and the existing partition panel from the lab.

 

RESOURCE CENTER ROOF REPLACEMENT:

  • The contractor continued demolition along S. Prieur Street and applied a two-ply roof.

 

RESIDENCE HALL 2ND FLOOR LOBBY RENOVATIONS:

  • The flooring contractor removed one row of tile to allow for the precast concrete installation.
  • The contractor placed the top precast panel along the storefront.