Louisiana State University Health Sciences Center Administration & Finance
 

WEDNESDAY, SEPTEMBER 9, 2009

 

1542 TULANE 1st FLOOR GARAGE ENTRANCE:

  • The sprinkler contractor installed additional sprinkler heads at the 1st Floor garage/building entrance.
  • The contractor insulated the chilled water return piping in the parking garage.

   

ALLIED HEALTH/NURSING REROOFING PROJECT:

  • The contractor continued to repair the metal panels on the parapet wall of the atrium roof.

 

CITY PARK CAMPUS:

  • The contractor replaced the window in the breezeway of the Dental School that was damaged by Gustav.

 

EXTERIOR/LANDSCAPING:

  • Facility Services continued demolition of the asphalt around the perimeter of the T-lot in preparation for the creation of new planting beds.

 

LIONS/LSU CLINIC BLDG.:

  • The contractor replaced half of the carpet on the 3rd Floor in Rooms 329A, 336 and 336B.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued relocation of the temporary A/C units from the 4th and 5th Floor Quadrant D to the 4th and 5th Floor Quadrant C (corner of Bolivar Street and MEB loading dock).
  • The contractor continued testing and balancing of air handling units 4-D and 5-D. 

 

RESIDENCE HALL 2ND FLOOR LOBBY RENOVATIONS:

  • The contractor delivered and installed the pool table and the ping pong table in the recreation room.

 

MEB 7th FLOOR PHYSIOLOGY LABS RENOVATION:

  • The contractor continued installing lab furniture in Room 7221.

 

RESOURCE CENTER ROOF REPLACEMENT:

  • The contractor removed the existing roof and applied the two-ply temporary roof system along Bolivar Street .