Louisiana State University Health Sciences Center Administration & Finance
 

TUESDAY, OCTOBER 20, 2009

 

1542 TULANE AVE. :

  • The contractor sanded and primed the sheetrock walls at the 2nd level garage entrance.
  • They installed the automatic door at the 1st Floor garage entrance.

 

CITY PARK CAMPUS:

  • The fencing contractor completed the installation of top rails, bottom rails, and tension bars along Florida Ave.
  • The contractor started driving piles along Florida and Moss Ave.

 

EXTERIOR/LANDSCAPING:

  • Facility Services installed irrigation piping adjacent to the Roman Garage along S. Roman Street .

 

LIONS/LSU CLINIC BLDG. 8TH FLOOR RENOVATIONS:

  • Facilities Services continued roughing in the plumbing for the small coffee room.

 

RESOURCE CENTER LIBRARY COMMONS:

  • The contractor fixed the floor tile and carpet at the main entrance. 

 

MEB 2nd FLOOR LOBBY RENOVATIONS:

  • The contractor completed installing the metal wall panels.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued relocating and installing temporary A/C units in the 4th and 5th Floors A Quadrant (corner of South Roman Street and the MEB loading dock).
  • The contractor continued balancing and testing AHUs 4-B and 5-B.   

 

MEB 4TH FLOOR MDL #4 RENOVATIONS:

  • The contractor continued roughing in for the new plumbing and electrical.
  • The contractor installed sheetrock in Room 4210.
  • The contractor installed corner guards along the corridor.

 

RESIDENCE HALL 2ND FLOOR LOBBY RENOVATIONS:

  • The State Fire Marshal completed his inspection and granted approval for occupancy.
  • The contractor continued installing the precast concrete bench.

 

RESOURCE CENTER ROOFING PROJECT:

  • The contractor started the installation of the first ply of the 2-ply roofing system on the Gravier St. penthouse and in the corner of Gravier and South Prieur Streets. 

 

UPTOWN CAMPUS:

  • The contractor continued the testing and programming of the new chillers.