Louisiana State University Health Sciences Center Administration & Finance
 

THURSDAY, OCTOBER 22, 2009

 

1542 TULANE ave. :

  • The contractor installed the ceiling grid for the 2nd level garage corridor.
  • The contractor removed the existing projection screen in the auditorium.

 

CITY PARK CAMPUS:

  • The contractor completed installation of the chain link fabric along Florida Avenue and continued constructing forms for the precast column base.

 

EXTERIOR/LANDSCAPING:

  • Facility Services completed installing irrigation piping, planted shrubs and spread mulch adjacent to the Roman Garage along S. Roman Street .

 

LIONS/LSU CLINIC BLDG. 8TH FLOOR RENOVATIONS:

  • The general contractor continued laying out the curved wall for the conference room. 

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued installing temporary A/C units in the 4th and 5th Floors A Quadrant (corner of South Roman Street and the MEB loading dock).
  • The contractor continued balancing and testing AHUs 4-B and 5-B.   

 

MEB 4TH FLOOR MDL #4 RENOVATIONS:

  • The contractor installed stud walls in Room 4210.

 

RESIDENCE HALL 2ND FLOOR LOBBY RENOVATIONS:

  • The contractor continued installing door hardware.

 

UPTOWN CAMPUS:

  • The contractor disconnected the temporary chiller from the building.