The architect has recommended that the contract be awarded to the low responsive bidder and LSUHSC has concurred.
The award of the contract should begin shortly.
1542 TULANE AVE. :
The contractor installed the carpet and vinyl tile for the 2nd level garage corridor.
MEB
AIR HANDLING UNIT REPLACEMENT:
Facility Services completed installing temporary A/C units in the 4th and 5th Floors A Quadrant (corner of South Roman Street and the MEB loading dock).
The contractor began selective demolition of collateral equipment on AHUs 4-A and 5-A.
MEB
4TH FLOOR MDL #4 RENOVATIONS:
The contractor continued installing new stud walls in Room 4210.