The contractor honed the terrazzo floors and cleaned the marble walls outside of Room 203.
The contractor installed the stainless steel cased opening for the 1st Floor Garage Entrance.
EXTERIOR/LANDSCAPING:
Facility Services winter flowers at various locations around the Downtown Campus and activated all irrigation stations around Roman Street Garage.
Facility Services installed conduit for lighting bollards on the Gravier Street side of the Roman Street Parking Garage.
MEB
AIR HANDLING UNIT REPLACEMENT:
Facility Services continued monitoring and adjusting the temporary A/C units in Quadrant A of the 4th and 5th Floors (corner of South Roman Street and the MEB loading dock).
The contractor completed the hot water piping for air handling unit 5-A, and continued installing ductwork and piping for 4-A and 5-A.
MEB
4TH FLOOR MDL #4 RENOVATIONS:
The contractor core drilled for the new plumbing.
The contractor roughed in plumbing in the main MDL room.
MEB
2ND FLOOR AUTOPSY ROOM HVAC UPGRADE:
The contractor removed exhaust duct in the chase by the 2nd Floor stairwell.
The contractor roughed in the electrical wiring.
RESOURCE CENTER ROOF REPLACEMENT:
The contractor replaced one row of glass panels in the atrium roof nearest Tulane Ave.
LIONS/LSU
CLINIC 8TH FLOOR RENOVATIONS:
The contractor opened up the new entrance to the conference room along Gravier Street .
CITY
PARK CAMPUS:
The contractor installed additional wire ties for the chain-link fencing along Florida Avenue .
UPTOWN
CAMPUS CHILLER REPLACEMENT:
The contractor continued to install insulation on piping and valves.
The contractor held training on new chiller operations for LSUHSC and Jani-King personnel.