Louisiana State University Health Sciences Center Administration & Finance
 

FRIDAY, OCTOBER 30, 2009

 

1542 TULANE AVE. :

  • The contractor installed lights in the 2nd Floor garage entryway and painted the corridor. 

 

CITY PARK CAMPUS:

  • The contractor installed additional wire ties for the chain-link fencing along Florida Avenue .

 

EXTERIOR/LANDSCAPING:          

  • Facility Services repaired the irrigation station on Bolivar Street between the CSRB and the Lions/LSU Clinic Building.             

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring and adjusting the temporary A/C units in Quadrant A of the 4th and 5th Floors (corner of South Roman Street and the MEB loading dock).
  • The contractor continued installing hot water piping for air handling unit 5-A, and ductwork for AHU 4-A and 5-A.   

 

MEB 4TH FLOOR MDL #4 RENOVATIONS:

  • The contractor raised HVAC duct in the main MDL room.
  • They continued roughing in the new plumbing and electrical in the main MDL room.
  • The contractor installed sheetrock in Room 4210.

 

MEB 2ND FLOOR AUTOPSY ROOM HVAC UPGRADE:

  • The contractor installed new exhaust duct on the 2nd Floor by the freight elevator.

 

RESOURCE CENTER ROOF REPLACEMENT:

  • The contractor replaced the break metal surrounding the glass windows along Tulane Ave.  

 

UPTOWN CAMPUS CHILLER REPLACEMENT:

  • The engineers, LSUHSC and Facility Planning and Control met with contractor on site and developed the punch list.