THURSDAY, OCTOBER 8, 2009

 

1542 TULANE AVE. :

  • The contractor poured concrete for the new ADA entrance ramp.
  • The contractor floated the sheetrock walls in Room 202A for the 2nd level garage corridor and at the S. Claiborne wall of the auditorium.
  • The contractor installed the power receptacle for the podium in the auditorium.

 

EXTERIOR/LANDSCAPING:

  • Facility Services completed planting shrubs and mulching around the perimeter of T-lot.

 

LIONS/LSU CLINIC BLDG. 8TH FLOOR RENOVATIONS

  • Facilities Services continued demolition of the conference and lobby areas.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services continued monitoring temporary A/C units in the 4th and 5th Floor Quadrant B (corner of South Roman Street and Perdido Street ).
  • The contractor completed installing ductwork and hot water piping for AHU 4-B and 5-B.
  • They insulated the chilled water piping for AHU 4-B and began the installation of electrical and control wiring.   

 

MEB 4TH FLOOR MDL #4 RENOVATIONS:

  • The contractor completed removing the old floor tiles. 

 

MEB 7th FLOOR PHYSIOLOGY LABS RENOVATIONS:

  • The contractor connected hot, cold, DI water, and drain lines in Room 7221, 7241, 7244, and 7250

 

RESIDENCE 2ND FLOOR LOBBY RENOVATIONS:

  • The contractor began installing the top precast panel starting from the Bolivar street side.

 

RESOURCE BUILDING ROOFING PROJECT:

  • The contractor completed applying the two-ply roofing system over the lightweight concrete at the main mechanical penthouse.