The contractor prepared the sub-floor for new flooring at the 1st level parking garage entrance.
FENCE
REPLACEMENT PROJECT:
The contractor continued installing the top, bottom rail and the fence fabric along Campus Road .
EXTERIOR/LANDSCAPING:
Facility Services laid sod at various locations around the Downtown Campus.
RESOURCE CENTER ROOF REPLACEMENT:
The contractor installed the cap sheet on the parapet wall along Bolivar Street and installed wooden supports on top of the parapet wall along S. Prieur Street .
MEB
AIR HANDLING UNIT REPLACEMENT:
Facility Services continued installing temporary A/C units in Quadrant D of the 2nd and 3rd Floors.
The contractor continued preparations for the demolition of AHU 3-D and 2-D.
LIONS/LSU
CLINIC BLDG 8TH FLOOR RENOVATIONS:
The contractor continued the electrical rough-in in the Directors area.