TUESDAY, NOVEMBER 17, 2009
EXTERIOR/LANDSCAPING:
- Facility Services continued installing irrigation piping at the corner of Bolivar St. and Poydras St.
- The contractor continued installing new bollard lights around the T-lot.
- The contractor began construction of concrete curbs on Bolivar St. between Poydras St. and Perdido St .
MEB
AIR HANDLING UNIT REPLACEMENT:
- Facility Services continued monitoring the temporary A/C in Quadrant D of the 2nd and 3rd Floors.
- The contractor completed the chilled water piping for AHU 2-D and continued installing ductwork, piping and electrical for AHU 2-D and 3-D.
LIONS/LSU
CLINIC BLDG 7TH FLOOR LAB RENOVATIONS:
- The contractor continued the demolition.
LIONS/LSU
CLINIC BLDG 8TH FLOOR RENOVATIONS:
- The contractor continued the electrical rough-in the Directors office area.
MEB
MDL 4 RENOVATIONS:
- The contractor continued framing the wall and installed sheetrock along the moveable partitions supports.
- The contractor continued roughing in the new plumbing below the 4th Floor.
- The contractor roughed in the electrical wiring for the digital signage in the elevator lobby.
|