The contractor installed exit lights and painted the sprinkler pipe in the 2nd Floor garage entryway.
The contractor installed the handrails on the handicap accessible ramp for the 1st Floor garage entrance.
CITY
PARK CAMPUS:
The contractor set new fence posts along the de Saix Subdivision from Moss Street to the security camera.
EXTERIOR/LANDSCAPING:
Facility Services planted annuals at various locations around the Downtown Campus.
MEB
AIR HANDLING UNIT REPLACEMENT:
Facility Services continued monitoring and adjusting the temporary A/C units in Quadrant A of the 4th and 5th Floors (corner of South Roman Street and the MEB loading dock).
The contractor completed the pipe insulation for AHU 5-A.
They completed installing the ductwork for AHU 4-A and 5-A.
The electrical and controls installation continues.
LIONS/LSU
CLINIC BLDG. 8TH FLOOR RENOVATIONS:
The contractor completed framing the curved wall.
RESOURCE CENTER ROOF REPLACEMENT:
The contractor replaced one additional row of glass in the atrium roof.
Three of fourteen rows have been completed.
The contractor completed applying the first ply of the 2-ply roofing system along South Prieur and underneath the Liebert units.
MEB
AUTOPSY HVAC EXHAUST UPGRADE:
The contractor continued to hang new exhaust ducts near the freight elevator.
MEB
MDL 4 RENOVATIONS:
The contractor roughed in the plumbing.
UPTOWN
CAMPUS CHILLER REPLACEMENT:
The contractor completed installation of the insulation on the chilled water piping.