The contractor installed conduit for the fire alarm devices at the 1st Floor entrance.
CITY
PARK CAMPUS:
The contractor demolished the second section of chain link fence from the security camera to the staff parking lot adjacent to the de Saix subdivision.
EXTERIOR/LANDSCAPING:
Facility Services completed planting annuals and mulching at various locations around the Downtown Campus.
MEB
AIR HANDLING UNIT REPLACEMENT:
Facility Services continued monitoring and adjusting the temporary A/C units in Quadrant A of the 4th and 5th Floors (corner of South Roman Street and the MEB loading dock).
The contractor continued installing controls and began balancing and testing AHU 4-A and 5-A.
LIONS/LSU
CLINIC BLDG. 8TH FLOOR RENOVATIONS:
The contractor started framing the fur down in the large conference room.
NEUROBIOLOGY
LAB RENOVATIONS:
The contractor removed the ceiling tiles and started removing millwork from walls.
RESOURCE CENTER ROOF REPLACEMENT:
The contractor replaced one additional row of glass.Five out of fourteen rows have been completed.
The contractor installed the plywood backing under the Liebert units and continued applying the 1st ply on the parapet along Perdido and South Prieur Street .
RESIDENCE
HALL LOBBY RENOVATIONS:
The contractor grouted the floor tile along the concrete bench.
MEB
MDL 4 RENOVATIONS:
The contractor roughed-in the plumbing on the S. Roman Street side of the room.