Monday, November 9, 2009CITY PARK CAMPUS: · The contractor set the third and fourth sections of fence posts in the area from the staff parking lot to Castine Street, adjacent to the de Saix subdivision. EXTERIOR/LANDSCAPING: · Facility Services prepared for possible high winds from Tropical Storm Ida at the Downtown, City Park and Uptown campuses. MEB AIR HANDLING UNIT REPLACEMENT: · Facility Services continued installing the temporary A/C units in Quadrant D of the 2nd and 3rd Floors. · The contractor completed balancing and testing AHU 4-A and 5-A. LIONS/LSU CLINIC BLDG. 8TH FLOOR RENOVATIONS: · The contractor continued framing the fur down in the large conference room and in the main lobby area. · They began installing the HVAC ductwork. LIONS/LSU CLINIC BLDG. NEUROBIOLOGY LAB RENOVATIONS: · The contractor removed old flooring and sheetrock. MEB AUTOPSY EXHAUST UPGRADE: · The contractor continued installing electrical conduit on the 1st Floor. MEB MDL 4 RENOVATIONS: · The contractor rerouted condenser water piping and began installing structural supports for the moveable partitions. RESIDENCE HALL LOBBY RENOVATIONS: · The contractor caulked the precast window sill. RESOURCE CENTER ROOF REPLACEMENT: · The contractor secured all equipment and ceased work in anticipation of high winds from Tropical Storm Ida. |
| Disclaimer | © 2013 LSUHSC | Privacy Policy |