Facility Services continued irrigation piping installation and grading along Bolivar Street adjacent to the Residence Hall parking lot.
1542 TULANE
AVE. FIRST FLOOR ADA
ENTRANCE:
The contractor installed bollards on the 1st Floor.
MEB
AIR HANDLING UNIT REPLACEMENT:
Facility Services continued installation of the temporary A/C units in Quadrant C of the 2nd and 3rd Floors and removed the temporary wall in Campus Stores.
The contractor completed testing and balancing AHUs 2-D and 3-D.
They continued electrical preparations for AHUs 2-C and 3-C.
LIONS/LSU
CLINIC 8TH FLOOR RENOVATIONS:
The contractor continued hanging sheetrock on the fur down in the main entrance and around the columns in the large conference room.
The contractor roughed in the electrical for the small conference room and the Directors office.
LIONS/LSU
CLINIC 7TH FLOOR LAB RENOVATIONS:
The contractor continued the mechanical demolition and started installing the heating hot water lines.
MEB
MDL 4 RENOVATIONS:
The contractor installed VCT in Rooms 4215A and 4210.
Crews continued relocating sprinkler heads in the main MDL room.
MEB
EXTERIOR SIGNAGE:
The contractor completed the wiring of the sign; the sign is fully functional.