THURSDAY, DECEMBER 3, 2009

 

EXTERIOR/LANDSCAPING:

·       Facility Services continued the irrigation piping installation and grading at the corner of Bolivar Street and Poydras Street adjacent to the Residence Hall parking lot.

 

1542 TULANE AVE. 1ST FLOOR ADA ENTRANCE:

·       The project passed the State Fire Marshall inspection. 

 

MEB AIR HANDLING UNIT REPLACEMENT:

·       Facility Services continued installing temporary A/C units in Quadrant C of the 2nd and 3rd Floors.

·       The contractor began selective demolition and new ductwork installation for AHU 2-C.  

 

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS: 

·       The contractor continued hanging sheetrock on the fur down in the main entrance and around columns in the large conference room. 

·       The contractor ran conduit in the Directors office. 

 

MEB MDL 4 RENOVATIONS:

·       The contractor continued relocating sprinkler heads in the main MDL room.

·       The contractor roughed in new gas pipe in the main MDL room.

 

MEB AUTOPSY HVAC UPGRADE:

·       The contractor began framing up the soffit in front of the cooler and installing new ceiling grid.

 

RESIDENCE HALL WATER PROOFING:

·       The contractor replaced caulk around the windows of additional 2 floors.  The contractor has now completed 4 of 9 floors.

 

RESOURCE CENTER ROOF REPLACEMENT:

·       The contractor installed the white cap sheet and flashing on the S. Prieur Street side of the roof.