EXTERIOR/LANDSCAPING:

  • Facility Services continued installing irrigation piping at the corner of Bolivar Street and Poydras Street adjacent to the Residence Hall parking lot.

 

FENCE REPLACEMENT PROJECT:

  • The contractor removed the swing gates and posts located at the Castine St. and Campus Rd. entrances.

 

1542 TULANE AVE. 1ST FLOOR ADA ENTRANCE:

  • The contractor painted the safety bollards, fire-sealed the pipe penetrations, and resealed the concrete ramp.

 

1542 TULANE AVE. 2ND FLOOR GARAGE ENTRANCE:

  • The contractor installed and painted the door and frame for the construction wall outside of Room 203.

 

MEB AIR HANDLING UNIT REPLACEMENT:

  • Facility Services completed the installation of the temporary A/C units in Quadrant C of the 2nd and 3rd Floors.
  • The contractor began demolition of AHU 2-C and AHU 3-C.
  • Crews completed the installation of AHU 2-C and the installation of ductwork for AHU 2-C.  

 

LIONS/LSU CLINIC BLDG 8TH FLOOR RENOVATIONS:

  • The contractor continued hanging sheetrock in the copy room.
  • The contractor roughed-in electrical receptacles in the Directors office. 

 

MEB MDL 4 RENOVATIONS:

  • The contractor continued relocating sprinkler heads and fabricated the gas pipe in the main MDL room.

 

MEB AUTOPSY HVAC UPGRADE:

  • The contractor installed sheetrock for the soffit in front of the cooler and built a wooden form for the new block walls.

 

RESIDENCE HALL WATER PROOFING:

  • The contractor replaced the caulk for two additional floors. 
  • The contractor has now completed 6 of 9 floors.

 

RESOURCE CENTER ROOF REPLACEMENT:

  • The contractor continued installing white cap sheet on the S. Prieur Street side of the roof.