ALLIED HEATL/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor removed the sheetrock ceiling in the distance learning classroom on the 1st Floor.
  • Crews removed ductwork from the 1st Floor.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued removing metal studs from the 1st Floor.

FENCE REPLACEMENT PROJECT:

  • The contractor continued installing decorative fence panels. They have completed 103 of 105 panels to date.

LIONS/LSU CLINIC BLDG 7th FLOOR LAB RENOVATIONS:

  • The electrical contractor continued to run electrical conduit on the 8th floor from the emergency panel to the 7th floor lab.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The electrical contractor continued to run electrical conduit for the light fixtures
  • The contractor continued installing sheetrock on the soffits in the main conference room.

MEB AHU REPLACEMENT PROJECT:

  • Facility Services continued monitoring the temporary air conditioning serving the cafeteria kitchen area.
  • The contractor completed the controls work on AHU 2-A and AHU 3-A.

MEB 2ND FLOOR AUTOPSY HVAC UPGRADE:

  • The contractor primed the corridor wall.

MEB 4TH FLOOR MDL #4 RENOVATION

  • The new lab stools were delivered.

RESIDENCE HALL FIRE ALARM UPGRADE:

  • The contractor continued installing and programming modules in the new fire alarm summary panel.

EXTERIOR/LANDSCAPING:

  • Facility Services trenched on both sides of the horseshoe drive in preparation for irrigation piping and wiring installation.