Louisiana State University Health Sciences Center Administration & Finance
 

WEDNESDAY, JANUARY 27, 2010

ALLIED HEALTH/NURSING PERMANENT REPAIRS & MITIGATION:

  • The contractor removed bathroom fixtures and started demolishing the Mens and Womens bathroom along Gravier street.
  • The contractor continued to remove metal studs and ductwork from the Bolivar Street side of the 1st Floor.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued removing metal studs and ceiling tiles on the 1st Floor.

LIONS/LSU CLINIC 7th FLOOR LAB RENOVATIONS:

  • The contractor continued installing conduit for emergency power on the 8th Floor.
  • Workers continued installing hangers for the ceiling grid and patching sheetrock.

MEB AHU REPLACEMENT PROJECT:

  • Facility Services continued monitoring the temporary air conditioning serving the cafeteria kitchen area.
  • The contractor completed testing and balancing AHU 3-A.
  • They continued to test and balance AHU 2-A and labeling the piping for all new units.

MEB 2ND FLOOR AUTOPSY HVAC UPGRADE:

  • The contractor continued making plumbing and electrical connections for the first new autopsy table.
  • Block wall was installed around the exhaust duct in the autopsy room.

RESIDENCE HALL FIRE ALARM UPGRADE:

  • The contractor completed installing new speakers and strobes on the 3rd through 11th Floors of the C tower.
  • Workers continued installing and programming modules in the new fire alarm summary panel.

RESIDENCE HALL LOBBY ROOF FLASHING:

  • The contractor cut the exterior metal panel on the 3rd Floor.

EXTERIOR/LANDSCAPING:

  • Facility Services installed control wiring in the island on the field side of the horseshoe and completed the remaining trenching along Florida Avenue.