ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor completed the demolition of the Men’s and Women’s bathrooms along Gravier St.
  • Crews continued to remove metal studs and ductwork from the Bolivar Street side of the 1st Floor.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor began installing conduit on the 1st Floor between the new switchgear location and riser B.

LIONS/LSU CLINIC 7th FLOOR LAB RENOVATIONS:

  • The contractor continued installing hangers for the ceiling grid and patching sheetrock.

LIONS/LSU CLINIC 8th FLOOR RENOVATIONS:

  • The contractor hung sheetrock in the large conference room and framed the doorway in the curved wall.

MEB AHU REPLACMENT PROJECT:

  • Facility Services continued monitoring the temporary air conditioning serving the cafeteria kitchen area.
  • The contractor removed and tested a malfunctioning flow measuring station on AHU 2-A and continued labeling piping for all new units.

MEB MDL 4 RENOVATIONS:

  • The contractor terminated data ports in the main MDL room.
  • They removed construction debris and cleaned up the main MDL room.

MEB 2ND FLOOR AUTOPSY HVAC UPGRADE:

  • The contractor continued installing block wall around the exhaust duct in the autopsy room.

RESIDENCE HALL FIRE ALARM UPGRADE:

  • The contractor installed new strobes and speakers on the mezzanine, second and first floors of A-C towers.
  • They continued installing and programming modules in the new fire alarm summary panel.

EXTERIOR/LANDSCAPING:

  • Facility Services commenced installation of irrigation piping on the field side of the horseshoe.