TUESDAY, FEBRUARY 23, 2010ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION: · The contractor removed tiles from the 1st Floor bathrooms near the switchgear. · They pulled wire for the 1st Floor lights on the Bolivar Street side of the building. RESOURCE CENTER PERMANENT REPAIRS & MITIGATION: · The contractor continued installing conduit on the 1st Floor from the new switchgear room to the new ATS room. · Workers began laying out the new walls in the mail processing area. RESIDENCE HALL PERMANENT REPAIRS & MITIGATION: · The contractor surveyed and marked the parking area in preparation for the pile driving. LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS: · The contractor painted the fur down in the lobby area. LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS: · The contractor pulled wires for lighting and receptacles in the renovated spaces. RESIDENCE HALL FIRE ALARM UPGRADE: · Contractor completed installation of fire devices in the 1st Floor fire pump room. MORGUE RENOVATIONS: · The contractor powered the exhaust fans on the roof and continued working on punch list EXTERIOR/LANDSCAPING: · Facility Services continued removing old vegetation from the center island of the horseshoe drive and installed irrigation station piping on the Florida Avenue side of the Clinic Building. |
| Disclaimer | © 2013 LSUHSC | Privacy Policy |