ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

·         The contractor installed electrical receptacles on the west side of the 1st Floor.

 

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

·         The contractor continued installing conduit on the 1st Floor between the new switchgear location and the tap box in Room 219.

 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

·         The contractor removed asphalt in the parking lot to prepare for construction of the new structure that will house the critical mechanical and electrical equipment.

 

LIONS/LSU CLINIC BLDG 7th FLOOR LAB RENOVATIONS:

·         The contractor relocated fire sprinklers in the lab area.

·         Crews installed the last ten ceiling panels on the 6th Floor removed for plumbing work.

 

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

·         The contractor taped and floated the sheetrock in the large and small conference rooms.

 

MEB 2ND FLOOR AUTOPSY HVAC UPGRADE:

·         The contractor installed the second autopsy table and connected the plumbing.

 

RESIDENCE HALL LOBBY ROOF FLASHING:

·         The contractor continued installing and welding in place the permanent metal flashing in apartment B34.

 

RESIDENCE HALL FIRE ALARM UPGRADE:

·         The contractor continued programming modules in the new fire alarm summary panel and new smoke detectors on the mezzanine, 1st and 2nd Floors.