WEDNESDAY, MARCH 10, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing electrical conduit in the main corridor on the 1st Floor.
  • Crews removed the sheetrock ceiling near the American flag on the 1st Floor.
  • The contractor ran cast iron roof drain pipe on the 1st Floor.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor installed conduit on the 1st Floor between the new switchgear location and the backup power tap box in Room 219.

LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS:

  • The contractor relocated sprinkler heads.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor continued installing the storefront system.

RESIDENCE HALL FIRE ALARM REPLACEMENT:

  • The new fire alarm panel is fully operational,
  • The contractor has begun testing the new system.

EXTERIOR/LANDSCAPING:

  • Facility Services completed grading the center island from the flagpole to Florida Avenue.
  • They installed landscape edging and placed mulch in the planting bed between the Clinic Building steps and the Administration Building steps.