THURSDAY, MARCH 11, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The contractor continued installing electrical conduit in the main corridor on the 1st Floor.
- Crews continue to run cast iron roof drain pipe on the 1st Floor.
- Demolition began in Room 244.
RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:
- The contractor surveyed core locations for post tension cables in the 3rd-8th Floor electrical rooms.
- They continued to run conduit from the new switchgear room to the ATS room on the 1st Floor.
LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS:
- The contractor installed sheetrock underneath the storefront joining the two labs.
LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:
- The contractor installed the ceiling grid trim in the lobby area.
- They started installing hangers for the ceiling grid in the large conference room.
FENCE REPLACEMENT PROJECT:
- The contractor completed installing all of the fence hats.
RESIDENCE HALL FIRE ALARM REPLACEMENT:
- The contractor continued testing the fire alarm system.
EXTERIOR/LANDSCAPING:
- Facility Services installed landscape edging and planted shrubs in the center island.
|