ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

·         The contractor continued installing electrical conduit in the main corridor on the 1st Floor.

·         Workers relocated domestic hot and cold water lines around the center column on the 1st Floor and started running a 5 inch roof drain from the walkway.  

 

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

·         The contractor marked core locations for post tension cables in the 2nd and 3rd Floor electrical rooms and in the new ATS and pump rooms.

·         They continued to lay out the walls on the 1st floor.  

 

LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS:

·         The contractor installed the 3 storefronts adjacent to the center hallway.

·         Heating hot water lines were run to the VAV boxes.

 

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

·         The AV contractor started running speaker wire in the large conference room.    

 

FENCE REPLACEMENT PROJECT:

·         The contractor continued painting the 24 monumental fence columns.

 

EXTERIOR/LANDSCAPING:

·         Facility Services completed planting shrubs and mulching the island in the horseshoe.

·         They mulched the planting bed on the Clinic Building side of the horseshoe.

·         Crews continued installing irrigation piping along Florida Avenue adjacent to the Clinic Building.