TUESDAY, MARCH 16, 2010ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION: · The contractor continued installing electrical conduit in the main corridor on the 1st Floor. · They continued running the 5†roof drain from the walkway. RESOURCE CENTER PERMANENT REPAIRS & MITIGATION: · The contractor demolished the concrete masonry unit (CMU) walls in preparation for installing electrical conduit in Room 115. RESIDENCE HALL PERMANENT REPAIRS & MITIGATION: · The contractor ran conduit for the exterior parking lot lights. LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS: · The contractor installed studs above and below the 3 storefronts adjacent to the center hallway. · Crews continued running heating hot water lines to the VAV boxes. LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS: · The contractor adjusted sprinkler heads in the main lobby area. RESIDENCE HALL FIRE ALARM REPLACEMENT: · The contractor continued testing and troubleshooting the new fire alarm panel. · They completed testing the flow and tamper switches and the access control functions during a fire alarm. · The output volume of all new speaker devices was increased. FENCE REPLACEMENT PROJECT: · The contractor completed painting the monumental fence columns. EXTERIOR/LANDSCAPING: · Facility Services continued mulching the planting bed on the Clinic Building side of the horseshoe. · Workers continued installing irrigation piping along Florida Avenue adjacent to the Clinic Building. · They began clearing the landscape in the courtyard between the Administration and Clinic Buildings. |
| Disclaimer | © 2013 LSUHSC | Privacy Policy |