TUESDAY, MARCH 2, 2010ALLIED HEALTH.NURSING BLDG PERMANENT REPAIRS & MITIGATION: · The contractor continued demolition in Rooms 211 and 212, 233 and 236. · Crews installed additional electrical conduit in the main corridor on the 1st Floor. · The controls contractor demolished pneumatic tubing in the 1st Floor mechanical room. RESOURCE CENTER PERMANENT REPAIRS & MITIGATION: · The contractor continued to run conduit for the new ATS room. RESIDENCE HALL PERMANENT REPAIRS & MITIGATION: · The contractor began driving piles to support the new structure that will elevate and house critical mechanical and electrical equipment. LIONS/LSU CLINIC BLDG 7th FLOOR LAB RENOVATIONS: · The contractor installed studs for the window storefront between the adjacent labs. LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS: · The contractor installed junction boxes for the large pendant light fixtures in the large conference room. RESIDENCE HALL FIRE ALARM UPGRADE: · The contractor installed duct detectors for air handling units 1, 2, 4, 5 and 6. FENCE REPLACEMENT PROJECT: · The contractor poured the concrete for 8 additional monumental columns. All but one of the 25 columns have now been poured. EXTERIOR/LANDSCAPING: · Facility Services repaired the washed out grading in the center island of the horseshoe. · They completed grading in the planting beds on the Clinic Building side of the horseshoe.
|
| Disclaimer | © 2013 LSUHSC | Privacy Policy |