ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor began laying CMU block in the stairwell near the MEB loading dock.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing two 4 inch domestic cold water lines along the C-tower on the Perdido Street side.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued running conduit on the 1st Floor and into Room 203 for future emergency lines.

LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS:

  • The contractor continued installing the lab furniture and connecting plumbing fixtures.
  • They began installing electrical conduit in the lab furniture.

LANDSCAPING/EXTERIOR:

  • Facility Services continued installing irrigation piping on the Florida Avenue Clinic Building at the Dental School and started the installation of irrigation piping on the parking lot side.