ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued laying CMU block in the stairwell near the MEB loading dock.
  • Workers installed electrical conduits on the 1st Floor area across from the MEB loading dock.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor poured concrete for 2 of the 12 columns.

LIONS/LSU CLINIC BLDG 7th FLOOR RENOVATIONS:

  • The contractor continued installing countertops and connecting plumbing fixtures for the lab furniture.

1542 COVERED WALKWAY:

  • The contractor brought in 4 loads of fill and removed the handicap ramp from the side entrance.

DENTAL SCHOOL FIELD GRADING:

  • Contractor installed silt fence along Florida Avenue and began clearing and grubbing the site.

FENCE REPLACEMENT PROJECT:

  • Contractor placed concrete for the second section of sidewalk adjacent to new fence.

LANDSCAPING/EXTERIOR:

  • Facility Services removed vegetation on the Florida Avenue side of the School of Dentistry Clinic Building and began grading.