ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

·         The contractor re-routed the acid waste line around the auditorium column.

 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

·         The contractor saw cut the pavement for the utility trenches on the South Roman Street side.

 

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

·         The contractor removed CMU blocks on the 1st Floor for Elevators 3 & 4.

 

LIONS/LSU CLINIC BLDG 7th FLOOR LAB RENOVATIONS:

·         The contractor continued to complete punch list items.

 

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

·         The contractor completed wiring the light fixtures in the small conference room and the hallway.

·         Workers painted the large conference room black and patched the walls in the small conference room and the Directors office.

 

CEB COVERED WALKWAY:

·         The contractor continued asbestos abatement of the active steam lines.

·         They completed demolition of the two abandoned pipe chases.

 

LANDSCAPING/EXTERIOR:

·         Facility Services completed installing sprinkler stations and began grading the field side of the horseshoe drive at the School of Dentistry.