Louisiana State University Health Sciences Center Administration & Finance
 

WEDNESDAY, JUNE 16, 2010

 

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

·         The contractor installed additional CMU block in the stairwell near the Bolivar and S. Roman Street.

·         They continue to run fire alarm cables to the 2nd Floor fire alarm panel.

·         The CMU block was removed from the elevator shaft.

 

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

·         The contractor trenched an area under the basketball court near Bolivar Street for the plumbing.

 

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

·         The contractor installed conduits in 1st Floor ceiling under the new switchgear room.

·         They began fabricating chilled water bypass piping in the 2nd Floor pump room.

 

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

·         The contractor began installing the ceiling tiles in the large conference room.

·         They completed installing the wood flooring in the small conference room.

·         Workers began installing the wood flooring in the Directors Office.

 

CEB COVERED WALKWAY:

·         The contractor continued to drive piles.  Approximate two thirds of the piles have been driven.