WEDNESDAY, JUNE 2, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The contractor continued installing electrical conduits along the steel beams.
RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:
- The contractor finished constructing the concrete forms and began installing steel rebar for the second level slab.
- They continued trenching on the S. Roman Street side of the parking area and installed additional electrical conduits underground.
DENTAL SCHOOL PATIENT PARKING LOT:
- The contractor started excavating for the storm drain pipe and placing the drain pipe in the trenches.
LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:
- The contractor installed ceiling tiles in the small conference room, offices area, and the corridor area.
- The soffit outside the large conference room was painted.
CEB COVERED WALKWAY:
- The contractor continued to fill and grade the site at the patio location.