ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing new ductwork along the steel beams.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing steel rebar in the concrete forms for the second level slab.
  • Crews continued trenching on the S. Roman Street side of the parking area and installed electrical conduits underground.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continued placing CMU block in the Elevator # 3 & #4 pit.

CEB COVERED WALKWAY:

  • The contractor continued to fill and grade the site at the 1542 patio.

DENTAL SCHOOL PATIENT PARKING LOT:

  • The contractor completed the block walls for the 4 new catch basins and backfilled the trenches for the new drain piping.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor continued installing wall panel frames and installed wall panels inside the large conference room.
  • Workers trimmed out the sprinkler heads in the office and small conference room area.