MONDAY, JUNE 7, 2010ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION: · The contractor installed new electrical lighting circuits on the 1st Floor and conduits for the fire alarm panels on the 2nd Floor. RESIDENCE HALL PERMANENT REPAIRS & MITIGATION: · The contractor began installing new electrical conduits on the 2nd level concrete slab. RESOURCE CENTER PERMANENT REPAIRS & MITIGATION: · The contractor laid CMU walls and ran electrical conduits in the office areas. · Crews installed conduit on the 1st and 2nd Floors. · The contractor completed blocking the shaft for elevators 3 and 4. DENTAL SCHOOL PATIENT PARKING LOT: · The contractor completed backfilling the trenches for the new drain piping. · They began grading the site in preparation for the installation of the underground electrical wiring.
LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS: · The contractor installed new wall panels in the large conference room. · They painted the office areas. CEB COVERED WALKWAY: · The wood piles were delivered to the 1542 parking lot. RESIDENCE HALL LOBBY RENOVATIONS: · The contractor is installing cladding on the handicap elevator lift. |
| Disclaimer | © 2013 LSUHSC | Privacy Policy |