Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, JULY 12, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor finished installing electrical panel D1A.
  • They continued to install new electrical conduit.
  • The general contractor applied the 3rd of 5 coats of fire proofing to the structural steel beams.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continued pulling wires in the new switchgear room on the 2nd Floor.
  • The mechanical contractor installed one of four air handling unit raised platforms in the 1st Floor mechanical room.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor partially removed an existing grade beam to allow for the new electrical duct bank installation in the main drive way.
  • Crews continued installing steel rebar in the concrete from for the roof of the new electrical/mechanical enclosure.

DENTAL SCHOOL PATIENT PARKING LOT:

  • The contractor completed installing protective bollards, concrete curbs, sidewalks, catch basins and graded the parking area in preparation for laying the asphalt paving.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor continued installing wall paper, cove base and millwork throughout the renovated space.