Louisiana State University Health Sciences Center Administration & Finance
 

FRIDAY, JULY 16, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The general contractor completed applying the fire proof coating to the structural steel beams.
  • The contractor completed re-installing granite panels surrounding the elevator lobby.
  • The elevator sub-contractor continued installing pit parts in Elevators 1-3.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor pulled wires for the roof generator.
  • The general contractor placed an AHU on the platform in the 1st floor mechanical room.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continued installing the new electrical duct bank in the main driveway.

DENTAL SCHOOL PATIENT PARKING LOT:

  • The contractor completed the asphalt paving.
  • They prepared for the electrical installation, demobilized the paving equipment and performed site clean-up.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The contractor installed cove base and doors.