ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor installed the 1st Floor call buttons for Elevators 1, 2, and 3.
  • A new electrical panel was installed on the 2nd Floor.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continues running electrical conduit on the 8th Floor.
  • The general contractor removed the CMU shaft wall for Elevators 1 and 2 on the 1st Floor.
  • The 2nd raised platform for an air handling unit was installed on the 1st Floor.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continues installing the new electrical duct bank in the main driveway.

DENTAL SCHOOL PATIENT PARKING LOT:

  • The contractor began applying the pavement markings.

LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:

  • The A/V contractor installed the podium in the large conference room.