THURSDAY, JULY 22, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The contractor began rewiring the electrical panels in the 1st floor electrical room.
- Workers continued to install conduit for the light fixtures on the 1st Floor.
- Elevators 1, 2 and 3 were returned to service.
LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:
- The contractor continued roughing in and installing the emergency light fixtures.
RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:
- The electrical contractor continued running electrical conduit on the 8th Floor.
- They installed receptacles and lights in elevator pits.
- A new junction box was installed in the 2nd Floor ATS room.
RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:
- The contractor installed electrical conduit near the electrical room in the B Tower.