WEDNESDAY, JULY 28, 2010
ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:
- The contractor continues to rewire the electrical panels in the 1st Floor electrical room.
- Workers continue removing metal wall studs from Rooms 218 and 219.
- They started removing the heating hot water pumps from the 2nd Floor mechanical room.
RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:
- The electrical contractor continues running conduit on the 8th Floor.
- The contractor created additional penetrations through the roof deck for the conduit that will serve the emergency generator.
RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:
- The contractor began the electrical rough-in for the 2nd level of the new elevated enclosure.
DENTAL SCHOOL PATIENT PARKING LOT:
- The contractor built concrete forms for the new driveway and sidewalks.
- The new sidewalks were poured.
LIONS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS:
- The contractor ran power and conduit to the floor penetration for the podium in the large conference room.