Louisiana State University Health Sciences Center Administration & Finance
 

FRIDAY, AUGUST 27, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The masonry contractor continued installing the metal lathe for the stucco walls in the Tiger Room.
  • The contractor continued welding connections for the chilled water lines on the 2nd Floor.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing electrical conduits on the 2nd level of the elevated enclosure.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continued installing bus duct in the 2nd Floor switchgear room.

CEB COVERED WALKWAY:

  • The contractor poured concrete for the footer near the District Entergy Garage.