ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The masonry contractor continued installing the metal lathe for the stucco walls in the Tiger Room and Room 147.
  • The contractor continued welding connections for the chilled water lines on the 2nd Floor and installed 20 feet of chilled water lines.
  • The contractor continued installing CMU block surrounding the new storefronts.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing electrical conduits on 2nd Floor of the elevated structure.
  • 2 of the 4 roof drains have been installed.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor continued to install bus duct in the switchgear room.

CEB COVERED WALKWAY:

  • The contractor re-graded the site to repair rain damage.