ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor is removing floor tiles from a portion of the 2nd Floor corridor.
  • Crews started removing the heat exchanger.
  • The removal of the back side of the red panels along the elevated walkway is complete.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor continues cleaning the 1st Floor ductwork.
  • Workers continue applying the waterproofing to the 1st Floor CMU walls that will protect Elevators 1 & 2.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor continued installing storm drain pipe for the roof of the new building.

DENTAL SCHOOL PATIENT PARKING LOT:

  • Concrete forms for the curbs and sidewalks were removed.

LIOHNS/LSU CLINIC BLDG 8th FLOOR RENOVATIONS: