ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The contractor removed the existing concrete pad for the pumps on the 2nd Floor.
  • Crews continued removing the heat exchanger.
  • Copper lines were run for the pneumatic panel.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor removed paint on the 1st Floor of Stairwell #2 (Bookstore side).
  • They continued cleaning ductwork on the 1st floor.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor installed 4 of a total of 40 precast panels that will form the walls of the new elevated mechanical/electrical enclosure.
  • Workers roughed in domestic cold water lines from the ground floor to the 2nd level of the structure.

DENTAL SCHOOL PATIENT PARKING LOT:

  • The contractor back-filled the planters and removed construction materials & debris from the site.