CEB COVERED WALKWAY:

  • The contractor poured concrete for the footers near the entrance to the Clinical Education Bldg. and along the main span of the walkway.

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The masonry contractor continued installing metal lathe for the stucco walls in rooms along the Bolivar Street on the 1st Floor.
  • The contractor continued making fittings for the chilled water and heating hot water lines.
  • They applied the second of two waterproofing coats to the elevator shaft walls.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The contractor installed concrete forms for the elevator shaft wall in the elevator pit.
  • The electrical contractor continued terminating grounding wiring for the new switchgear.