Louisiana State University Health Sciences Center Administration & Finance
 

MONDAY, SEPTEMBER 13, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The masonry contractor continued installing metal lathe for the stucco walls in rooms along the Bolivar Street on the 1st Floor.
  • The contractor continued making fittings for the chilled water and heating hot water lines.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor poured concrete for the parking islands on the ground floor.
  • The electrical contractor continued installing conduits on the 2nd Floor.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor installed the last section of bus duct that connects the switchgear to the Entergy vault.