Louisiana State University Health Sciences Center Administration & Finance
 

THURSDAY, SEPTEMBER 2, 2010

ALLIED HEALTH/NURSING BLDG PERMANENT REPAIRS & MITIGATION:

  • The masonry contractor continued installing the metal lathe for the stucco walls in Room 147.
  • Crews continued welding connections for the chilled water lines on the 2nd Floor.
  • The contractor continued installing CMU block surrounding the storefronts and on the stairwell along Roman Street.

RESIDENCE HALL PERMANENT REPAIRS & MITIGATION:

  • The contractor completed setting the forms for the parking islands on the ground floor, beneath the elevated structure.
  • Workers repaired the chips in the concrete precast panels.
  • The contractor continued installing electrical conduits on the 2nd level.

RESOURCE CENTER PERMANENT REPAIRS & MITIGATION:

  • The electrical contractor pulled wires for the new switchgear located on the 2nd Floor.